The team competed in the 2023 Regional Student Steel Bridge Competition at Rowan University. Overall, the team was able to successfully assemble the bridge within the time constraints. The construction time was 36 minutes and the bridge weighed approximately 470 pounds. However, there were discrepancies during the load testing due to horizontal sway, and the team was ultimately disqualified. During the Dinner and Awards Banquet, the TCNJ team was awarded first place in Aesthetics. Although the team would have liked to successfully load tested the bridge, the team is satisfied with the results and gained a lot from the Senior Project.