OUR PROGRESS
Take a look at the work that we are completing and follow along as we progress on our steel bridge!
The team presented the Fall 2022 Design Presentation which included details regarding the project objectives, alternative designs, final design, and final design specifications and details. The team has begun preparing CAD drawings for the Machine Shop in preparation for fabrication. Additionally, the team ordered materials from McKnight Steel Inc. The team ordered 1 inch and 1.5 inch tubing along with one-quarter inch plates to use cut for connections. The team is excited to start fabrication!